GROUP ANTOLIN

Let’s Build Something Great Together

Completed Project: GROUP ANTOLIN

We are thrilled to present the successfully completed construction of the GROUP ANTOLIN facility in NIGHOJE, CHAKAN MIDC, PUNE, covering a highly optimized 72,000 SQ.FT area. This landmark project, spearheaded by Bhagirath Narayan Constructions (BNC), was delivered with our signature commitment to excellence, innovation, and quality.

Key Highlights of the Completed Work:

  • Civil Construction: Our expert team delivered ultra-flat, high-grade concrete flooring with dust-resistant coatings, specifically designed to support advanced injection molding machines, automated assembly areas, and clean-room environments.

  • PEB (Pre-Engineered Buildings): We successfully engineered and erected a high-efficiency PEB structure featuring advanced thermal insulation. This ensures a strictly controlled indoor temperature necessary for the adhesive bonding and assembly of premium automotive headliners and door panels.

  • MEP (Mechanical, Electrical, and Plumbing): Complex, high-performance MEP systems were integrated, featuring specialized climate control (HVAC) systems for dust prevention, dedicated compressed air loops for pneumatic tools, and custom electrical busway systems for flexible machinery layouts.

Fast-Paced Delivery:

Despite the highly precise dust-control and environmental requirements of a world-class tier-1 automotive supplier, our team successfully delivered this 72,000 SQ.FT facility within the 2022-23 schedule while meeting strict international automotive safety standards.

This state-of-the-art manufacturing plant now stands fully completed and operational, engineered for precision fabrication and propelling GROUP ANTOLIN into new heights of production quality.

  • GROUP ANTOLIN
  • NIGHOJE, CHAKAN MIDC, PUNE
  • 72,000 SQ.FT
  • 2022 - 2023
  • --
  • Bhagirath Narayan Constructions
  • Completed